Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Image / jpg / 1.84 MB

Nathalie Leroy

Member of the Board of Management at Open Grid Europe GmbH (CFO) Focus: Finance, purchasing, human resources, legal and regulatory affairs

Image / zip / 52.60 MB

press kit

Color and inverted logo, eps and jpg / Photos of the management / Photo of the headquarter / Photos of compressor station and pipeline construction. OGE grants the users the right to use, store and reproduce the texts, images and graphics provided in the press kit in whole or in part for journalistic purposes within the scope of the applicable press and copyright law, whereby OGE must be named as source/author. The use and reproduction of the OGE logo requires the prior consent of OGE.

Network connection, Metering point operation natural gas/biogas / pdf / 0.98 MB

Network interconnection contract

Pursuant to Article 7 of the Gas Network Access Ordinance, network operators have to sign network interconnection contracts with operators of networks to which they are connected via a network interconnection point. The specimen network interconnection contract published by Open Grid Europe is based on the provisions of Section 2 of Part 3 (Articles 26-31) and of Part 5 (Articles 52-62) of the Agreement on Cooperation between Operators of Gas Supply Networks Located in Germany as Amendement from 22nd March 2024 (KoV XIV), which is attached to the contract as Annex 5 for information. Annexes 1 to 4 of the network interconnection contract describe in more concrete terms the provisions of Section 2 of Part 3 (Articles 26-31) of the KoV XIV as provided in Article 26, Section 3 of KoV XIV. The supplementary provisions describe, in particular, the exact location of the network interconnections (Annex 1), their combination (where applicable) into exit zones (Annex 4) and the technical framework applicable to the relevant network interconnection and/or the relevant exit zone (only in German).

Network connection, Metering point operation natural gas/biogas / pdf / 0.97 MB

Network connection contract

This contract governs the connection of the gas plant of the connection customer to the gas supply network of Open Grid Europe (network connection) at the connection point for the withdrawal of gas (exit point). It contains above all provisions governing the operation of, and changes to, the gas pressure regulating and metering station assigned to the network connection point, as well as the exchange of information between the parties to the contract (only in German).

Market information natural gas/biogas / pdf / 110.31 KB

Contractual pressure and temperature at entry points

Valid for transports as of 01. January 2025 (German only)

Market information natural gas/biogas / pdf / 966.90 KB

BDEW/VKU/GEODE-Guideline / Crisis Preparedness Gas

BDEW/VKU/GEODE-Guideline Status 03/2024 (only in German)

Field sites / pdf / 1.76 MB

Directions to M&R Station Legden

Asbecker Str. (K29), 48739 Legden

Internal order / pdf / 102.16 KB

Adjustment of internal order during the year

published on 01 January 2025 (only in German)

Internal order / pdf / 115.04 KB

Form for the submission of the internal order

for non-availability of systems (only in German)

Internal order / pdf / 105.40 KB

Request for multi-year order

published on 01 January 2025 (only in German)

Internal order / pdf / 71.02 KB

System responsibility data update during the year

published on 01 January 2025 (only in German)

Press releases / pdf / 198.32 KB

European companies launch the Alliance to accelerate decarbonisation through the H2med Southwestern Hydrogen Corridor

The five H2med TSO partners are part of this Alliance which main goal is to get the H2med Southwestern Hydrogen Corridor set in motion by the early 2030´s.

Press releases / jpeg / 2.32 MB

Press photo: European companies launch the Alliance to accelerate decarbonisation through the H2med Southwestern Hydrogen Corridor

Nico Raß, Head of Business Development Hydrogen International, Rodrigo Costa, CEO of REN and Simon Halberstadt, Executive Vice President Sales Development SEFE Energy GmbH, signing a Joint Declaration of Intent to develop the southwestern import corridor for hydrogen.

Press releases / jpeg / 2.94 MB

Press photo: European companies launch the Alliance to accelerate decarbonisation through the H2med Southwestern Hydrogen Corridor

Twelve companies and five TSOs are working together to develop the southwestern import corridor for hydrogen. They signed a joint declaration of intent at the German Embassy in Madrid.

Press releases / pdf / 68.41 KB

OGE receives ESG Transparency Award for its excellent 2023 Sustainability report

With its 2023 report, OGE competed for the ESG Transparency Award for the first time, achieving an overall score of 86%, which places the report in the Excellence Class.

Press releases / jpg / 211.71 KB

OGE receives ESG Transparency Award for its excellent 2023 Sustainability report

With its 2023 report, OGE competed for the ESG Transparency Award for the first time, achieving an overall score of 86%, which places the report in the Excellence Class.

Others / pdf / 101.21 KB

Rules of procedure for the reporting mechanism

in accordance with Section 8 of the Supply Chain Due Diligence Act (LkSG) and the Whistleblower Protection Act (HinSchG) Preface These rules of procedure serve to ensure compliance with the requirements of the LkSG and the HinSchG. They describe

Market information natural gas/biogas / pdf / 455.42 KB

Ruling of the Federal Network Agency BK9-23/612

Decision ‘MARGIT 2025‘ of 26/05/2024

Others / pdf / 1.55 MB

Policy statement in accordance with the LkSG

Policy Statement on Human Rights Strategy, Status 28 October 2024

Market information natural gas/biogas / pdf / 312.27 KB

Publication by Open Grid Europe GmbH according to the network code on harmonised transmission tariff structures

Art. 29 and 30 of Regulation (EU) 2017/460 (Network Code Tariffs)